Looking for places where non-sewage may be entering Lakewood’s sewer system, the firm hired by the Village Board was out pumping “smoke” into Country Club Additions pipes.
Looking across the street, a truck was seen and the realization entered my mind that this was the work to find leaks in the sewer system where unwanted water might be entering the sewer sysetm.
By the afternoon, the operation had moved down to Lakewood’s last street, Gate 3.
A report will be prepared for the Village citing locations that might have contributed to the summer’s flooding.
Does Mary McClelland live around there?
No